Player 0 Cagayan de Oro, Philippines
Joshua Ryle Zamayla Bracho
Web. Mobile. Wired together.
Web Developer, Mobile App Developer, Systems Integrator
- 5+years freelancing
- 10projects
- 5company systems
Chapter II · Side quests
Side quests worth the detour.
5 projects I built because I wanted them to exist. Real screens on sample data: no smoke, no mirrors.
Side quest 01Aug 2026 to now
Git to NetSuite Time Tracker
Turns my git commits into ready-to-paste NetSuite timesheets.
Logging a month of work in NetSuite took 2–3 days of digging through commits.
Result Monthly time logging cut from 2–3 days to 3–4 hours (my estimate).
- Python
- Git
- Vanilla JavaScript
- Bash
Side quest 02Jul 2026
SwelTrack
HR and payroll built for Philippine payroll rules.
Generic HR tools handle Philippine payroll poorly: premiums, benefits and time corrections.
Result Built from first screen to a full security pass in 12 days.
- Laravel
- Livewire
- Alpine.js
- Tom Select
Side quest 03Apr 2026
TaskForge
Manages Windows scheduled tasks from simple JSON files.
Setting up Windows scheduled tasks by hand is slow and hard to repeat.
Result Repeatable task setup, tested from day one.
- Python
Side quest 04Nov 2026 to now
WAIS
A private money manager for iPhone and Android.
I wanted a money tracker where all my data stays on my own phone.
Result Built in six days: local data, backup, passcode lock and a guided tour.
- Flutter
- Dart
- Riverpod
- Drift (SQLite)
Side quest 05Nov 2026
ISBOGI
Live van arrivals and seats, built as a research pilot.
I needed a working app to test whether commuters find live van arrivals and seat counts useful.
Result A working pilot with a facilitator panel for repeatable user testing.
- Node.js
- Vanilla JavaScript
- Leaflet
Chapter III · The main quest
The main quest, in production.
5 company systems, described from commit history. Their code and screens stay private, so they appear under generic names, as illustrations.
Main quest 01Oct 2025 to now
Field Operations & Support Platform
Runs support tickets, deployments and technician bookings.
Support and field work was scattered across spreadsheets and separate tools.
Result Now used across company operations, making routine work run more smoothly.
- Laravel
- Livewire
- Alpine.js
Main quest 02Oct 2025 to now
Field Technician Mobile App
The app technicians use on site, even with no signal.
Technicians often work where there's poor or no signal.
Result Found a data-format bug and rebuilt sync to be reliable.
- Flutter
- Dart
- Drift
Main quest 03Aug 2026 to now
Client Service Portal
Lets clients track tickets and download sign-offs.
Clients had to email to find out where their tickets stood.
Result Built from scratch in two months.
- Laravel
- Filament
Main quest 04Jul 2026 to now
Production Floor Planning Board
A shared floor planner with live edit locks.
Several teams plan the same floor and could overwrite each other.
Result Sign-in, permissions and audit trail in place in the first week.
- Laravel
- Vue
Main quest 05May – Sep 2026
Procurement Pricing Workflow
Pricing requests, vendor quotes and approvals in one place.
Pricing requests had no consistent way to compare vendors or track status.
Result Hardened in one day: access control, audit trail, safe uploads and tests.
- Laravel
- Livewire
Chapter IV · Skill tree
Skills, with receipts.
No self-rated stars here: one level is one verified milestone from the case studies.
33 skills in 6 branches, powered by 71 verified milestones. One level = one milestone, up to 5.
Hover a skill to see what it connects to. Click one for the proof behind it. Arrow keys travel the web.
- Level 1
- Level 2
- Level 3
- Level 4
- Level 5 (max)
- Self-reported
Player 0Chapter V · Loot
Loot from the grind.
The highlights, each with its source.
- 18/18quests complete
- 1750loot XP
- 4legendary drops
- 10projects touched
- Common My own account
- Rare 1 to 2 milestones
- Epic 3 milestones
- Legendary 4 or more milestones
- Complete
Side questEpic+100 XP
Built a private money app in six days
WAIS went from an empty project to backup, passcode lock and a guided tour, 9–14 November 2026.
Show the proof (3 milestones)
- Project setup and local databaseWAIS · 9 Nov 2026
- Backup, restore and resetWAIS · 10 Nov 2026
- Interactive app tourWAIS · 14 Nov 2026
Source: Commit history
- Complete
Side questRare+50 XP
Built a research pilot with its own control panel
A simulated van fleet, a live map and a facilitator panel for running repeatable user tests, in November 2026.
Show the proof (2 milestones)
- Simulated fleet and APIISBOGI · 2 Nov 2026
- Facilitator panel with test scenariosISBOGI · 2 Nov 2026
Source: Project history
- Complete
Side questRare+50 XP
Speaks the commuter's language
ISBOGI switches between English and Bisaya, and warns when its data goes stale.
Show the proof (2 milestones)
- English and BisayaISBOGI · 2 Nov 2026
- Built for weak signalISBOGI · 2 Nov 2026
Source: Project history, Nov 2026
- Complete
Main questLegendary+200 XP
Left every codebase safer than I found it
Tenant isolation, stronger passwords, safe uploads, request checks and a release guard, across four projects.
Show the proof (5 milestones)
- Tenant isolation and duplicate-run protectionSwelTrack · 12 Jul 2026
- Stronger passwords and policy-based authorisationSwelTrack · 12 Jul 2026
- Safer file uploadsProcurement Pricing Workflow · 16 Sep 2026
- Request checks and a branch-safe clean-upGit to NetSuite Time Tracker · 9 Oct 2026
- Release build guardField Technician Mobile App · 26 Aug 2026
Source: Commit history
- Complete
Main questLegendary+200 XP
A phone that never loses a job
Found a data-format drift between the app and its server, then replaced polling with an ordered queue and added a circuit breaker.
Show the proof (4 milestones)
- Found a critical sync bugField Technician Mobile App · 24 Jul 2026
- Queued sync instead of pollingField Technician Mobile App · 26 Aug 2026
- Circuit breaker for the serverField Technician Mobile App · 8 Oct 2026
- Screen-aware background syncField Technician Mobile App · 27 Oct 2025
Source: Commit history, Jul – Oct 2026
- Complete
Main questLegendary+200 XP
A client portal, from zero to linked
Two-factor accounts, ticket tracking, sign-offs and a health-checked link to the operations platform, in about two months.
Show the proof (5 milestones)
- User administration with two-factor sign-inClient Service Portal · 13 Aug 2026
- Ticket trackingClient Service Portal · 24 Aug 2026
- Completed sign-offs for clientsClient Service Portal · 18 Aug 2026
- Health-checked platform connectionClient Service Portal · 3 Sep 2026
- Feedback forwarded to the operations teamClient Service Portal · 21 Sep 2026
Source: Commit history, Aug – Oct 2026
Epilogue · Checkpoint
Checkpoint reached. Ready for the next run?
If something here looks like what you need built, let’s talk. The one-page resume is the short version.
whoami
Joshua Ryle Zamayla Bracho. Web Developer, Mobile App Developer, Systems Integrator, based in Cagayan de Oro, Philippines.
ls ./contact
- githubcode and older projects
- linkedinwork history
- facebooksay hello
- instagramlife outside the code
- resume.pdfone-page resume
- puts my address on your clipboard






